| Project | Second dormitory for the Primary school |
| Start | 1st November 2009 |
| Completion | COMPLETED! |
At present there are 374 pupils at the Primary School in the „Land of Hope“, and most of them sleep in the dormitory. The dormitory is already becoming too littleso that it is very necessary for us to build a second one.
Moreover we shall have a P7 class, starting in the next term (February 2010). And all in all not less than 430 pupils are expected!
That’s why we started to build an additional dormitory on November 1st. It will look exactly the same as the one we have already on the outside and shall be finished by the end of June 2010.
| 27th July 2010 | |
| The building of the new dormitory had been finished and the children could already move into their new accomodations! The children are very excited about that - as you can see in the pictures. Even we are very happy and say "Thank you" for every donation and prayer! On July 15th we inaugurated the the new dormitory (together with other buildings) in a great inauguration ceremony with the Archbishop of the anglican church. |
|
![]() |
![]() |
![]() |
![]() |
| 18th June 2010 | |
![]() The new dormitory has beenfinished and is waiting for the children to move in! |
|
| 17th May 2010 | |
![]() The walls are painted and the gardens cleaned up |
![]() The wall connects the dormitory with the Primary school |
| 30th April 2010 | |
![]() |
![]() |
| 25th March 2010 | |
![]() The roof is about to be finished! |
|
| 19th February 2010 | |
![]() We have reached at the point of constructing the roof timber! |
|
| 13th February 2010 | |
![]() |
![]() |
| 21st January 2010 | |
![]() after the christmas break work goes on... |
![]() ...by building the upper level! |
| 08th December 2009 | |
![]() the brickt of the lower level have been layed... |
![]() ...the slab is being prepared |
| 23rd November 2009 | |
![]() The foundation has been finished |
![]() The walls for the lower level are being built |
| 17th November 2009 | |
![]() The foundation walls are finished, the stones are spread |
![]() Today the first part of the foundation was concreted! |
| 11th November 2009 | |
![]() Walls of the foundation are built |
![]() Stones for the foundation were delivered |
![]() Mixing concrete - Handwork! |
![]() Earth works for the foundation |
![]() |
![]() |
| 4th November 2009 | |
![]() The building site with the Primary school in the back |
![]() mixing concrete for the foundation |
![]() The fosses for the foundation are already finished |
![]() In the back you can see the sit of the new assembly hall |